Payoda
Payoda
Get a Demo →

From nuclear
to renewables.
Continuous standards review.

Utilities navigate IEEE, IEC, NERC, and regulator-specific standards across decades-long asset lifecycles. standrdX turns standards review into a continuous capability, not a project-end scramble. Same engine across nuclear, gas, transmission, distribution, renewables, and grid modernization.

Built for
NuclearThermal & GasWind & SolarStorage & HybridTransmission & DistributionGrid Modernization

The Challenge

Decades-long assets. Standards that change every quarter. Reviews that can't wait until project end.

A power asset placed in service today will operate for 30–60 years. The standards governing it will revise dozens of times. Most utilities review standards compliance at project gates and at regulator audits, and miss the cumulative drift in between. standrdX makes standards review continuous.

01

The standards stack is deep and live

IEEE for power equipment, IEC for international interoperability, NERC for North American reliability, FERC for market structure, plus owner-specific specifications and regulator orders. All revising, all with effective dates, all with addenda.

How standrdX solves this
  • HierarchyAddendum overrides parent standard automatically
  • ScopeOverrides bound to the exact clause and class
  • TraceableEvery override cites the source addendum row
01 / 06
Auto-cycling · hover a card to lock focus
Lifecycle

standards tracking, not project-end batch

Audit

defensible trail with clause-level cites

340+

utility standards loaded across IEEE, IEC, NERC

RBAC

multi-tenant for IOUs, munis, co-ops

Standards Coverage

Every code that matters across generation, T&D, and the grid edge.

From IEEE C57 transformer standards through NERC CIP cybersecurity, IEC 61850 substation automation, and 10 CFR 50 nuclear quality, standrdX reads the canon and reasons across the addenda, errata, and owner-specific specifications that change clause-level applicability.

IEEE C57IEEE 1547IEEE 1584IEC 61850IEC 61400IEC 60909NERC CIPNERC TPLFERC Order 222210 CFR 50ASME Section IIINQA-1+ owner specs+ PUC orders
Power & Utilities Solution Brief cover
Solution Brief · Power & Utilities

Power & Utilities Solution Brief

IEEE, IEC, and NERC CIP compliance across the grid lifecycle, from substation design to ongoing operations. Continuous compliance, not pre-audit scrambles.

Get your copy

Make standards review a continuous capability.

2-week scoped pilot. 1 representative standard, 8–10 sample documents. A working prototype benchmarked against your manual review. No platform commitment.